- Site: Heysham 2
- IR number: 19-027
- Date: June 2019
- LC numbers: N/A
Executive summary
Purpose of Intervention
This was a planned inspection of EDF Energy Nuclear Generation Ltd.’s (NGL’s) Heysham B power station, undertaken as part of the planned intervention strategy for the Operating Facilities Division (OFD) of the Office for Nuclear Regulation (ONR).
The work carried out was in-line with the planned inspection programme contained in the Heysham B Integrated Intervention Strategy (IIS).
The purpose of this intervention was to ensure that the Licensee was showing compliance with the requirements of the Regulatory Reform (Fire Safety) Order 2005.
Interventions Carried Out by ONR
The intervention focused on both the management of fire safety and the practical fire safety provision within selected areas and facilities across the site. I informed the licensee that this inspection would focus on the conditions that relate to normal generating conditions:
- I conducted meetings to assess the approach being taken to the management of fire safety and the testing and maintenance of the fire safety systems across this facility.
- I used the relevant legislation relating to this inspection to focus on life fire safety issues. During my inspection, I challenged those accompanying me, and others about procedures and approaches to the practical application of maintaining adequate fire safety provision.
- I questioned personnel to test effectiveness and knowledge of arrangements.
- I examined a series of documents prior to my arrival on site.
- I took the opportunity throughout the walk down phase of my inspection to point out examples of obstacles and fire safety issues that are likely to compromise the application of the current fire safety strategy.
- I undertook a walk-through of a number of pre-selected facilities on the site paying particular attention to the practical application of the fire safety strategy.
Explanation of Judgement if Safety System Not Judged to be Adequate
NOT APPLICABLE THIS WAS NOT A SYSTEM BASED INSPECTION
Key Findings, Inspector's Opinions and Reasons for Judgements Made
My overall impression was one of a fire safety team which applies a robust approach to fire safety, ensuring that it is taken seriously and is given the due consideration it deserves. I am of the opinion that senior managers have identified fire as a significant hazard to Heysham B Power Station site and those persons that work within it. Throughout the inspection I noted that all of those that I had contact with, demonstrated a suitable focus, support and attention to fire safety.
During both the walk down and the meetings held during the day I identified a number of examples of industry good practice. A number of minor improvements and recommendations aiming to further enhance the standards of fire safety will be followed up with the licensee’s Fire Safety Coordinator (FSC).
My inspection has provided me with the confidence that the fire safety arrangements are effective and being implemented to a satisfactory standard.
Conclusion of Intervention
I concluded with an assessment of compliance with the legislation, and presented deficiencies and recognised areas of good practice at a wash-up meeting.
Overall my findings in relation to the areas I inspected, demonstrate a good level of fire safety provision and management. The FSC understands that in order for the fire safety strategy in place at Heysham B to achieve its goal, it is necessary that all members of staff are aware of the strategy and the rationale behind it.
The inspection outcome was rated as GREEN.