Executive summary

Date(s) of inspection: July 2024

Aim of inspection

The purpose of the inspection was to review compliance of the dutyholder’s arrangements for class 7 radioactive material for road and/or rail transport

Subject(s) of inspection

  • Transport - Consignee Duties - Rating: Green
  • Transport - Consignor Duties - Rating: Green
  • Transport - Dangerous Goods Safety Advice - Rating: Green
  • Transport - Emergency/Contingency Planning and Testing - Rating: Green
  • Transport - Incidents, Events and Reporting processes - Rating: Green
  • Transport - Management Systems - Rating: Green
  • Transport - Package Maintenance and Operation - Rating: Green
  • Transport - Radiation Protection Advisor - Rating: Green
  • Transport - Radiation Protection Programme - Rating: Green
  • Transport - Radiation Risk Assessment - Rating: Green
  • Transport - Security - Rating: Green
  • Transport - Training and Competence - Rating: Green

Key findings, inspector's opinions and reasons for judgement made

The inspectors identified a number of examples of the dutyholder meeting relevant good practice in reducing risk to levels that are ALARP, including, suitable IRR17 registration, notification & consent, appropriate local rules, contingency plans and a comprehensive set of procedures and arrangements covering all aspects of transport.

The inspectors identified two areas of non-compliance which were the radiation risk assessment and the emergency arrangements. These were discussed during the inspection.

Conclusion

The inspection findings were presented to Tradebe Inutec Ltd at the close of the inspection.

We judged an overall inspection rating of green was appropriate for this inspection as relevant good practice was generally met, with only minor shortfalls identified, when compared with appropriate benchmarks.

Tradebe Inutec Ltd is required to provide to ONR either with evidence that the identified two non-compliances have been resolved, or an appropriate resolution plan with timescales for completion, by the 27 September 2024. These non-compliances will be tracked to completion via a Level 4 Regulatory Issue.