GDA issue |
GDA issue ref |
Resolution plan |
Revised resolution plan schedules or revised resolution plans |
Closure report |
Internal Hazards |
Internal Fire Safety Case Substantiation |
GI-AP1000-IH-01 GDA Issue |
GI-AP1000-IH-01 Resolution Plan |
GI-AP1000-IH-01 Revised Resolution Plan |
GI-AP1000-IH-01 Closure Report |
Internal Flooding Safety Case |
GI-AP1000-IH-02 GDA Issue |
GI-AP1000-IH-02 Resolution Plan |
GI-AP1000-IH-02 Revised Resolution Plan |
GI-AP1000-IH-02 Closure Report |
Pressure Part Failure |
GI-AP1000-IH-03 GDA Issue |
GI-AP1000-IH-03 Resolution Plan |
GI-AP1000-IH-03 Revised Resolution Plan |
GI-AP1000-IH-03 Closure Report |
Internal Explosion Safety Case Substantiation |
GI-AP1000-IH-04 GDA Issue |
GI-AP1000-IH-04 Resolution Plan |
GI-AP1000-IH-04 Revised Resolution Plan |
GI-AP1000-IH-04 Closure Report |
Internal Missile Safety Case |
GI-AP1000-IH-05 GDA Issue |
GI-AP1000-IH-05 Resolution Plan |
GI-AP1000-IH-05 Revised Resolution Plan |
GI-AP1000-IH-05 Closure Report |
Substantiation and Analysis of the Consequences of Dropped Loads and Impact from Lifting Equipment Included Within the AP1000 Design |
GI-AP1000-IH-06 GDA Issue |
GI-AP1000-IH-06 Resolution Plan |
GI-AP1000-IH-06 Revised Resolution Plan |
GI-AP1000-IH-06 Closure Report |
Civil Engineering |
Justification of Novel Form of Structure for the Steel/ Concrete Composite Walls and Floors Known as CA Modules |
GI-AP1000-CE-01 GDA Issue |
GI-AP1000-CE-01 Resolution Plan |
GI-AP1000-CE-01 Revised Resolution Plan |
GI-AP1000-CE-01 Closure Report |
Further Justification of Novel Form of Structure for Steel / Concrete Composite Wall to the Enhanced Shield Building |
GI-AP1000-CE-02 GDA Issue |
GI-AP1000-CE-02 Resolution Plan |
GI-AP1000-CE-02 Revised Resolution Plan |
GI-AP1000-CE-02 Closure Report |
AP1000 Material Standards and Material Specifications |
GI-AP1000-CE-03 GDA Issue |
GI-AP1000-CE-03 Resolution Plan |
GI-AP1000-CE-03 Revised Resolution Plan |
GI-AP1000-CE-03 Closure Report |
Fuel Handling Area Secondary Containment Leak Detection and Collection System |
GI-AP1000-CE-04 GDA Issue |
GI-AP1000-CE-04 Resolution Plan |
GI-AP1000-CE-04 Revised Resolution Plan |
GI-AP1000-CE-04 Closure Report |
Probabilistic Safety Analysis (PSA) |
Success Criteria for the PSA |
GI-AP1000-PSA-01 GDA Issue |
GI-AP1000-PSA-01 Resolution Plan |
GI-AP1000-PSA-01 Revised Resolution Plan |
GI-AP1000-PSA-01 Closure Report |
Fire PSA |
GI-AP1000-PSA-02 GDA Issue |
GI-AP1000-PSA-02 Resolution Plan |
GI-AP1000-PSA-02 Revised Resolution Plan |
GI-AP1000-PSA-02 Closure Report |
Fault Studies |
Spent Fuel Pool Safety Case |
GI-AP1000-FS-01 GDA Issue |
GI-AP1000-FS-01 Resolution Plan |
GI-AP1000-FS-01 Revised Resolution Plan |
GI-AP1000-FS-01 Closure Report |
Design Reference Point and Adequacy of Design Basis Analysis |
GI-AP1000-FS-02 GDA Issue |
GI-AP1000-FS-02 Resolution Plan |
GI-AP1000-FS-02 Revised Resolution Plan |
GI-AP1000-FS-02 Closure Report |
Diversity for Frequent Faults |
GI-AP1000-FS-03 GDA Issue |
GI-AP1000-FS-03 Resolution Plan |
GI-AP1000-FS-03 Revised Resolution Plan |
GI-AP1000-FS-03 Closure Report |
Use of In-core Detectors to Protect Against Adverse Power Distributions |
GI-AP1000-FS-04 GDA Issue |
GI-AP1000-FS-04 Resolution Plan |
GI-AP1000-FS-04 Revised Resolution Plan |
GI-AP1000-FS-04 Closure Report |
Potential Enhancements to the Diverse Safety Injection System |
GI-AP1000-FS-05 GDA Issue |
GI-AP1000-FS-05 Resolution Plan |
GI-AP1000-FS-05 Revised Resolution Plan |
GI-AP1000-FS-05 Closure Report |
Validation of the IRWST Cooling Function for the PRHR |
GI-AP1000-FS-06 GDA Issue |
GI-AP1000-FS-06 Resolution Plan |
GI-AP1000-FS-06 Revised Resolution Plan |
GI-AP1000-FS-06 Closure Report |
Safety Case for Shutdown Faults |
GI-AP1000-FS-07 GDA Issue |
GI-AP1000-FS-07 Resolution Plan |
GI-AP1000-FS-07 Revised Resolution Plan |
GI-AP1000-FS-07 Closure Report |
Fault Schedule for AP1000 |
GI-AP1000-FS-08 GDA Issue |
GI-AP1000-FS-08 Resolution Plan |
GI-AP1000-FS-08 Revised Resolution Plan |
GI-AP1000-FS-08 Closure Report |
Control & Instrumentation |
Adequacy of Safety Case for DAS |
GI-AP1000-CI-01 GDA Issue |
GI-AP1000-CI-01 Resolution Plan |
GI-AP1000-CI-01 Revised Resolution Plan |
GI-AP1000-CI-01 Closure Report |
DAS Adequacy of Architecture |
GI-AP1000-CI-02 GDA Issue |
GI-AP1000-CI-02 Resolution Plan |
GI-AP1000-CI-02 Revised Resolution Plan |
GI-AP1000-CI-02 Closure Report |
Diversity Between the PMS (CIM) and DAS |
GI-AP1000-CI-03 GDA Issue |
GI-AP1000-CI-03 Resolution Plan |
GI-AP1000-CI-03 Revised Resolution Plan |
GI-AP1000-CI-03 Closure Report |
PMS Spurious Operation |
GI-AP1000-CI-04 GDA Issue |
GI-AP1000-CI-04 Resolution Plan |
GI-AP1000-CI-04 Revised Resolution Plan |
GI-AP1000-CI-04 Closure Report |
SMART Device Justification for Use |
GI-AP1000-CI-05 GDA Issue |
GI-AP1000-CI-05 Resolution Plan |
GI-AP1000-CI-05 Revised Resolution Plan |
GI-AP1000-CI-05 Closure Report |
Ovation Platform - Adequacy of Safety Case |
GI-AP1000-CI-06 GDA Issue |
GI-AP1000-CI-06 Resolution Plan |
GI-AP1000-CI-06 Revised Resolution Plan |
GI-AP1000-CI-06 Closure Report |
DCIS - Adequacy of Safety Case |
GI-AP1000-CI-07 GDA Issue |
GI-AP1000-CI-07 Resolution Plan |
GI-AP1000-CI-07 Revised Resolution Plan |
GI-AP1000-CI-07 Closure Report |
PMS - Adequacy of Safety Case |
GI-AP1000-CI-08 GDA Issue |
GI-AP1000-CI-08 Resolution Plan |
GI-AP1000-CI-08 Revised Resolution Plan |
GI-AP1000-CI-08 Closure Report |
CIM - Adequacy of Safety Case |
GI-AP1000-CI-09 GDA Issue |
GI-AP1000-CI-09 Resolution Plan |
GI-AP1000-CI-09 Revised Resolution Plan |
GI-AP1000-CI-09 Closure Report |
Class 1 Displays and Controls |
GI-AP1000-CI-010 GDA Issue |
GI-AP1000-CI-010 Resolution Plan |
GI-AP1000-CI-010 Revised Resolution Plan |
GI-AP1000-CI-010 Closure Report |
Essential Electrical Systems |
PCSR Presentation of Claims Arguments and Evidence |
GI-AP1000-EE-01 GDA Issue |
GI-AP1000-EE-01 Resolution Plan |
GI-AP1000-EE-01 Revised Resolution Plan |
GI-AP1000-EE-01 Closure Report |
Fuel Design |
Fuel Pin Modelling Safety Justification |
GI-AP1000-FD-01 GDA Issue |
GI-AP1000-FD-01 Resolution Plan |
GI-AP1000-FD-01 Revised Resolution Plan |
GI-AP1000-FD-01 Closure Report |
Tolerability of Depressurisation Forces in LBLOCA |
GI-AP1000-FD-02 GDA Issue |
GI-AP1000-FD-02 Resolution Plan |
GI-AP1000-FD-02 Revised Resolution Plan |
GI-AP1000-FD-02 Closure Report |
Use of the BEACON Code for On-line Compliance |
GI-AP1000-FD-03 GDA Issue |
GI-AP1000-FD-03 Resolution Plan |
GI-AP1000-FD-03 Revised Resolution Plan |
GI-AP1000-FD-03 Closure Report |
Reactor Chemistry |
Accident Source Terms |
GI-AP1000-RC-01 GDA Issue |
GI-AP1000-RC-01 Resolution Plan |
GI-AP1000-RC-01 Revised Resolution Plan |
GI-AP1000-RC-01 Closure Report |
Primary Sampling System |
GI-AP1000-RC-02 GDA Issue |
GI-AP1000-RC-02 Resolution Plan |
GI-AP1000-RC-02 Revised Resolution Plan |
GI-AP1000-RC-02 Closure Report |
Hydrogen Dosing System |
GI-AP1000-RC-03 GDA Issue |
GI-AP1000-RC-03 Resolution Plan |
GI-AP1000-RC-03 Revised Resolution Plan |
GI-AP1000-RC-03 Closure Report |
Radiation Protection |
Spent Fuel Pool Criticality Safety Case |
GI-AP1000-RP-01 GDA Issue |
GI-AP1000-RP-01 Resolution Plan |
GI-AP1000-RP-01 Revised Resolution Plan |
GI-AP1000-RP-01 Closure Report |
Mechanical Engineering |
Squib Valve Concept and Design Substantiation |
GI-AP1000-ME-01 GDA Issue |
GI-AP1000-ME-01 Resolution Plan |
GI-AP1000-ME-01 Revised Resolution Plan |
GI-AP1000-ME-01 Closure Report |
Metrication of Mechanical Equipment and Civil Structural Steelwork Connections |
GI-AP1000-ME-02 GDA Issue |
GI-AP1000-ME-02 Resolution Plan |
GI-AP1000-ME-02 Revised Resolution Plan |
GI-AP1000-ME-02 Closure Report |
Mechanical System Pipework Design |
GI-AP1000-ME-03 GDA Issue |
GI-AP1000-ME-03 Resolution Plan |
GI-AP1000-ME-03 Revised Resolution Plan |
GI-AP1000-ME-03 Closure Report |
Structural Integrity |
Avoidance of Fracture |
GI-AP1000-SI-01 GDA Issue |
GI-AP1000-SI-01 Resolution Plan |
GI-AP1000-SI-01 Revised Resolution Plan |
GI-AP1000-SI-01 Closure Report |
Fatigue Analysis |
GI-AP1000-SI-02 GDA Issue |
GI-AP1000-SI-02 Resolution Plan |
GI-AP1000-SI-02 Revised Resolution Plan |
GI-AP1000-SI-02 Closure Report |
Reactor Coolant Pump |
GI-AP1000-SI-03 GDA Issue |
GI-AP1000-SI-03 Resolution Plan |
GI-AP1000-SI-03 Revised Resolution Plan |
GI-AP1000-SI-03 Closure Report |
Containment Vessel |
GI-AP1000-SI-04 GDA Issue |
GI-AP1000-SI-04 Resolution Plan |
GI-AP1000-SI-04 Revised Resolution Plan |
GI-AP1000-SI-04 Closure Report |
Compliance of AP1000 Main Structural Components with ASME III Design Rules |
GI-AP1000-SI-05 GDA Issue |
GI-AP1000-SI-05 Resolution Plan |
GI-AP1000-SI-05 Revised Resolution Plan |
GI-AP1000-SI-05 Closure Report |
Categorisation and Classification |
GI-AP1000-SI-06 GDA Issue |
GI-AP1000-SI-06 Resolution Plan |
GI-AP1000-SI-06 Revised Resolution Plan |
GI-AP1000-SI-06 Closure Report |
Human Factors |
Completeness of the HF Safety Case |
GI-AP1000-HF-01 GDA Issue |
GI-AP1000-HF-01 Resolution Plan |
GI-AP1000-HF-01 Revised Resolution Plan |
GI-AP1000-HF-01 Closure Report |
Cross-Cutting |
Limits and Conditions |
GI-AP1000-CC-01 GDA Issue |
GI-AP1000-CC-01 Resolution Plan |
GI-AP1000-CC-01 Revised Resolution Plan |
GI-AP1000-CC-01 Closure Report |
PCSR to Support GDA |
GI-AP1000-CC-02 GDA Issue |
GI-AP1000-CC-02 Resolution Plan |
GI-AP1000-CC-02 Revised Resolution Plan |
GI-AP1000-CC-02 Closure Report |
Consider and Action Plans to Address the Lessons Learnt from the Fukushima Event |
GI-AP1000-CC-03 GDA Issue |
GI-AP1000-CC-03 Resolution Plan |
GI-AP1000-CC-03 Revised Resolution Plan |
GI-AP1000-CC-03 Closure Report |