GDA Issue |
GDA Issue Ref. |
Resolution Plan |
Revised Resolution Plan Schedules or Revised Resolution Plans |
Closure letter |
Closure report |
Internal Hazards |
Dropped Loads and Impact |
GI-UKEPR-IH-01 GDA Issue |
GI-UKEPR-IH-01 Resolution Plan |
N/A |
GI-UKEPR-IH-01 letter |
GI-UKEPR-IH-01 Close Out Report |
Verification & Validation Studies |
GI-UKEPR-IH-02 GDA Issue |
GI-UKEPR-IH-02 Resolution Plan |
N/A |
GI-UKEPR-IH-02 letter |
GI-UKEPR-IH-02 Close Out Report |
Internal Flooding and Operator Actions |
GI-UKEPR-IH-03 GDA Issue |
GI-UKEPR-IH-03 Resolution Plan |
GI-UKEPR-IH-03 Programme rev |
GI-UKEPR-IH-03 letter |
GI-UKEPR-IH-03 Close Out Report |
Substantiation of Break Preclusion Claims for RCC-M Components |
GI-UKEPR-IH-04 GDA Issue |
GI-UKEPR-IH-04 Resolution Plan |
N/A |
GI-UKEPR-IH-04 letter |
GI-UKEPR-IH-04 Close Out Report |
Civil Engineering and External Hazards |
Hypothesis and Methodology Notes for Class 1 Structures |
GI-UKEPR-CE-01 GDA Issue |
GI-UKEPR-CE-01 Resolution Plan |
N/A |
GI-UKEPR-CE-01 letter |
GI-UKEPR-CE-01 Close Out Report |
Use of ETC-C for the Design and Construction of the UK EPR |
GI-UKEPR-CE-02 GDA Issue |
GI-UKEPR-CE-02 Resolution Plan |
N/A |
N/A |
GI-UKEPR-CE-02 Close Out Report |
Beyond Design Basis Behaviour of the Containment |
GI-UKEPR-CE-03 GDA Issue |
GI-UKEPR-CE-03 Resolution Plan |
N/A |
GI-UKEPR-CE-03 letter |
GI-UKEPR-CE-03 Close Out Report |
Containment Analysis |
GI-UKEPR-CE-04 GDA Issue |
GI-UKEPR-CE-04 Resolution Plan |
N/A |
GI-UKEPR-CE-04 letter |
GI-UKEPR-CE-04 Close Out Report |
Reliability of the ETC-C |
GI-UKEPR-CE-05 GDA Issue |
GI-UKEPR-CE-05 Resolution Plan |
N/A |
N/A |
GI-UKEPR-CE-05 Close Out Report |
Seismic Analysis Methodology |
GI-UKEPR-CE-06 GDA Issue |
GI-UKEPR-CE-06 Resolution Plan |
N/A |
N/A
|
GI-UKEPR-CE-06 Close Out Report |
Fault Studies |
Heterogeneous Boron Dilution Faults |
GI-UKEPR-FS-01 GDA Issue |
GI-UKEPR-FS-01 Resolution Plan |
GI-UKEPR-FS-01 Programme rev |
GI-UKEPR-FS-01 letter |
GI-UKEPR-FS-01 Close Out Report |
Diversity for Frequent Faults |
GI-UKEPR-FS-02 GDA Issue |
GI-UKEPR-FS-02 Resolution Plan |
GI-UKEPR-FS-02 Programme rev |
N/A |
GI-UKEPR-FS-02 Close Out Report |
Safety Case for Cask Reloading Pit |
GI-UKEPR-FS-03 GDA Issue |
GI-UKEPR-FS-03 Resolution Plan |
GI-UKEPR-FS-03 Programme rev |
N/A |
GI-UKEPR-FS-03 Close Out Report |
Steam Generator Tube Rupture Safety Case |
GI-UKEPR-FS-04 GDA Issue |
GI-UKEPR-FS-04 Resolution Plan |
N/A |
N/A |
GI-UKEPR-FS-04 Close Out Report |
Design Basis Analysis of Essential Support Systems |
GI-UKEPR-FS-05 GDA Issue |
GI-UKEPR-FS-05 Resolution Plan |
GI-UKEPR-FS05-Programme rev |
N/A |
GI-UKEPR-FS-05 Close Out Report |
Control & Instrumentation |
Design Information for Non-Computerised Safety System Required |
GI-UKEPR-CI-01 GDA Issue |
GI-UKEPR-CI-01 Resolution Plan |
GI-UKEPR-CI-01 Programme rev |
N/A |
GI-UKEPR-CI-01 Close Out Report |
Protection System Independent Confidence Building Measures |
GI-UKEPR-CI-02 GDA Issue |
GI-UKEPR-CI-02 Resolution Plan |
GI-UKEPR-CI-02 Programme rev |
N/A |
GI-UKEPR-CI-02 Close Out Report |
Claims, Arguments, Evidence Trail |
GI-UKEPR-CI-03 GDA Issue |
GI-UKEPR-CI-03 Resolution Plan |
GI-UKEPR-CI-03 Programme rev |
N/A |
GI-UKEPR-CI-03 Close Out Report |
SMART Devices |
GI-UKEPR-CI-04 GDA Issue |
GI-UKEPR-CI-04 Resolution Plan |
GI-UKEPR-CI-04 Programme rev |
N/A |
GI-UKEPR-CI-04 Close Out Report |
Obsolescence of SPPA T2000 Platform |
GI-UKEPR-CI-05 GDA Issue |
GI-UKEPR-CI-05 Resolution Plan |
GI-UKEPR-CI-05 Programme rev |
N/A |
GI-UKEPR-CI-05 Close Out Report |
Absence of Adequate C&I Architecture |
GI-UKEPR-CI-06 GDA Issue |
GI-UKEPR-CI-06 Resolution Plan |
GI-UKEPR-CI-06 Programme rev |
N/A |
GI-UKEPR-CI-06 Close Out Report |
Essential Electrical Systems |
PCSR Presentation of Claims Arguments and Evidence |
GI-UKEPR-EE-01 GDA Issue |
GI-UKEPR-EE-01 Resolution Plan |
GI-UKEPR-EE-01 Programme rev |
N/A |
GI-UKEPR-EE-01 Close Out Report |
Reactor Chemistry |
Combustible Gas Mitigation |
GI-UKEPR-RC-01 GDA Issue |
GI-UKEPR-RC-01 Resolution Plan |
GI-UKEPR-RC-01 Programme rev |
N/A |
GI-UKEPR-RC-01 Close Out Report |
Control and Minimisation of Ex-Core Radiation |
GI-UKEPR-RC-02 GDA Issue |
GI-UKEPR-RC-02 Resolution Plan |
GI-UKEPR-RC-02 Programme rev |
N/A |
GI-UKEPR-RC-02 Close Out Report |
Structural Integrity |
Avoidance of Fracture |
GI-UKEPR-SI-01 GDA Issue |
GI-UKEPR-SI-01 Resolution Plan |
GI-UKEPR-SI-01 Programme rev |
N/A |
GI-UKEPR-SI-01 Close Out Report |
Structural Integrity - RPV Surveillance Scheme |
GI-UKEPR-SI-02 GDA Issue |
GI-UKEPR-SI-02 Resolution Plan |
GI-UKEPR-SI-02 Programme rev |
N/A |
GI-UKEPR-SI-02 Close Out Report |
Radiation Protection |
Radiological Zoning and Bulk Shielding |
GI-UKEPR-RP-01 GDA Issue |
GI-UKEPR-RP-01 Resolution Plan |
N/A |
N/A |
GI-UKEPR-RP-01 Close Out Report |
Human Factors |
Inadequate Substantiation of Human Based Safety Claims |
GI-UKEPR-HF-01 GDA Issue |
GI-UKEPR-HF-01 Resolution Plan |
GI-UKEPR-HF-01 Programme rev |
N/A |
GI-UKEPR-HF-01 Close Out Report |
Cross-Cutting |
Categorisation and Classification of Systems Structures & Components |
GI-UKEPR-CC-01 GDA Issue |
GI-UKEPR-CC-01 Resolution Plan |
GI-UKEPR-CC-01 Programme rev |
N/A |
GI-UKEPR-CC-01 Close Out Report |
Consolidated Final GDA Submission |
GI-UKEPR-CC-02 GDA Issue |
GI-UKEPR-CC-02 Resolution Plan |
GI-UKEPR-CC-02 Programme rev |
N/A
|
GI-UKEPR-CC-02 Close Out Report |
Consider and Action Plans to Address the Lessons Learnt From the Fukushima Event |
GI-UKEPR-CC-03 GDA Issue |
GI-UKEPR-CC-03 Resolution Plan |
GI-UKEPR-CC-03 Programme rev |
N/A |
GI-UKEPR-CC-03 Close Out Report |