Hinkley Point C - Inspection ID: 53086

Executive summary

Date(s) of inspection: 

  • January 2025

Aim of inspection

The aim of the inspection was to inspect NNB Generation Company (HPC) Ltd's (NNB GenCo) arrangements for compliance with Licence Condition (LC) 19, construction or installation of new plant, in relation to civil engineering construction assurance. LC19 requires that where the licensee proposes to construct or install any new plant, which may affect safety, the licensee makes and implements adequate arrangements to control the construction or installation.

The objective of the inspection was to obtain evidence in relation to the adequacy of NNB GenCo’s arrangements for the control of construction of the N3 buildings at Hinkley Point C (HPC). The particular focus of the inspection was on the implementation of arrangements to ensure conformant construction of civil engineering elements, in accordance with the design intent and safety case.

Subject(s) of inspection

  • LC19 - Construction or installation of new plant - Rating: Green

Key findings, inspector's opinions and reasons for judgement made

The evidence sampled provided confidence that the implementation of arrangements for the construction of the N3 buildings were adequately controlled. Furthermore, that where sampled, the construction of the N3 buildings was found to align with the design intent and the safety case.

I also judge that the civil engineering contractor and sub-contractor's arrangements in relation to construction of the nuclear safety significant N3 buildings are being implemented and are aligned with relevant good practice.

This inspection highlighted no significant regulatory issues.

A small number of minor observations were made.

On the basis of the evidence sampled, and in recognition of progress to date, I was satisfied that the arrangements in place comply with LC19.

Conclusion

On the basis of the evidence sampled, I judge that NNB GenCo has implemented corporate arrangements in compliance with LC19 (construction or installation of new plant). In relation to the specific areas sampled, I judge that NNB GenCo’s implementation of arrangements for the construction of the N3 buildings were adequately controlled.

Overall, I was satisfied with the adequacy of NNB GenCo's ongoing arrangements for the construction of the N3 buildings. On the basis of the evidence sampled, and in recognition of progress to date, I was satisfied that the arrangements in place comply with LC19. Upon consideration of the ONR guidance in relation to inspection ratings, I judge that a rating of Green (no formal action) is appropriate.